A Simple Key For site acceptance test checklist Unveiled
The client will get assurance the PLC program satisfies their operational necessities and operates reliably in the new facility. After the site is cleaned and all fixtures are installed, an interior box force and air flow Test is carried out. This test is conducted in order that the Place is effectively pressurized and There's suitable air flow.Wh